HNTB performed type selection, conceptual and preliminary design and owner’s engineer responsibilities for the 2,000-foot-long cable-stayed bridge that opened in October 2020 LOS ANGELES (June 1, 2021) – HNTB was part of the team honored with Project…

Port of Long Beach and Caltrans open new Gerald Desmond Bridge Replacement Project in Long Beach
HNTB performed type selection, conceptual and preliminary design and owner’s engineer responsibilities for the new 2,000-foot-long cable-stayed bridge…