/ Category / Gerald Desmond Bridge Replacement Project

Gerald Desmond Bridge Replacement Project wins Project of the Year from California Transportation Foundation

June 1, 2021 - in Awards, News

HNTB performed type selection, conceptual and preliminary design and owner’s engineer responsibilities for the 2,000-foot-long cable-stayed bridge that opened in October 2020   LOS ANGELES (June 1, 2021) – HNTB was part of the team honored with Project…

Port of Long Beach and Caltrans open new Gerald Desmond Bridge Replacement Project in Long Beach

October 5, 2020 - in Bridges, News, Projects, Transportation

HNTB performed type selection, conceptual and preliminary design and owner’s engineer responsibilities for the new 2,000-foot-long cable-stayed bridge…