REDCOM Celebrates Ribbon-Cutting For Innovative Health And Wellness Sauna
A ribbon-cutting was held Saturday morning, May 30th, at Beem Light Sauna, 282 South Avenue, Fanwood, an infrared sauna, and red-light therapy studio. Owners Kara and Ron Shovlin and staff were joined by Ryan Teicher and Joe Orsita of REDCOM, Fanwood Councilwoman Erin McElroy Barker and Gina Berry, Economic Development Director Liz Jeffery, and Westfield Area Chamber of Commerce Executive Director Faith Delaney and Board of Directors President Jim Mooney. Westfield, NJ — REDCOM Design & Construc...
Civitas Selected to Lead Landscape Architecture and Campus Visioning for North Boulder Creative Campus
DENVER, CO — [June 9, 2026] — Denver-based landscape architecture and urban design firm Civitas has been selected to lead the landscape architecture and campus visioning for the North Boulder Creative Campus, a transformative mixed-use cultural district planned in North Boulder, Colorado, in partnership with the Boulder Museum of Contemporary Art (BMoCA), Emerald Development, internationally recognized architecture studio SO–IL and regional partner Coburn. Planned as a new civic and cultural hub...
STV Celebrates Topping Out of New Franklin City Hall
FRANKLIN, TN – STV joined the City of Franklin to celebrate the topping out of its new 97,460-square-foot, three-story City Hall, a milestone in the multi‑phase redevelopment of the city’s historic Public Square. The placement of the final structural steel beam signals continued progress on a project reshaping downtown Franklin’s civic and public spaces. STV is serving as owner’s project manager (OPM) for the new City Hall, guiding the project through design, procurement, construction and closeo...
Forte Construction Corp. Successfully Completes Three Elevator Replacements at Dekalb Station
The Major Accessibility Project was Completed One Month Ahead of Schedule Forte Construction completed the installation of three new elevators at Dekalb Station one month ahead of schedule, delivering a major accessibility enhancement at one of Downtown Brooklyn’s busiest transit hubs. Installed by the Forte–Gramercy Joint Venture alongside the MTA, Lead Designer Stantec, and the Naik–STV JV PMC, the upgraded elevators significantly improve accessibility at the 111-year-old station, enhancing ac...
Gale Associates Leads Historic Restoration of the Barnstable Superior Courthouse
ROCKLAND, MA – June 2, 2026 – Gale Associates, Inc., a consulting engineering firm specializing in building enclosure consulting and historic preservation, is leading the evaluation, design, and construction administration for the historic restoration of the Barnstable Superior Courthouse building enclosure. Gale was retained by Barnstable County, Massachusetts for the $7 million restoration project in coordination with the Massachusetts Trial Court and ClearPath Advisors, the Owner’s Project Ma...
Stantec selected to support major redevelopment of BC Ferries’ Horseshoe Bay terminal
Infrastructure updates will strengthen connectivity across British Columbia’s Lower Mainland, Sunshine Coast, and Vancouver Island British Columbia Ferry Services Inc. (BC Ferries) has selected Stantec, a global leader in sustainable design and engineering, to provide engineering services for the phased redevelopment of the Horseshoe Bay terminal in West Vancouver, one of the busiest ferry terminals on Canada’s West Coast. The terminal plays a vital role in connecting coastal and island communit...
Kansas City Celebrates Grand Opening of HDR-Designed KC Streetcar Riverfront Extension
Newest KC Streetcar Extension Expands Access to Growing Riverfront On May 18, 2026, Kansas City celebrated the grand opening of the $62 million KC Streetcar Riverfront Extension. The project adds 0.7 miles of track to the existing KC Streetcar line, connecting north from the River Market to Berkley Riverfront Park. The Riverfront Extension is the second of the streetcar line in Kansas City to open in the past seven months. The newest extension will serve CPKC Stadium, home of the KC Current of t...
STV Partners with DriveOhio to Develop a Connected Vehicle to Everything (V2X) Deployment Plan
COLUMBUS, OH – STV today announced it is developing a connected vehicle (CV) deployment plan to support the Ohio Department of Transportation’s (ODOT) DriveOhio initiative. As part of its scope, STV’s deployment planning services will help create a statewide plan in response to the USDOT’s National V2X Deployment plan. STV’s plan will make recommendations for the deployment strategy of Cellular Vehicle-to-Everything (C-V2X) and Vehicle to Network (V2N) technologies to facilitate safety, mobility...
Topsides load-out streamlined with Mega Jack and weighing solution
Constructability analysis optimizes fabrication, weighing, jacking and load-out of 33,000t Scarborough topsides. Involving Mammoet in the early stages of a project brings huge benefits to the construction, lifting and transportation of colossal structures like topsides. By building topsides in a way that makes them easier and safer to move, project timelines shorten, as the dots between different phases smoothly join up. Smart heavy lifting techniques also allow fabrication at a low height,...
After Devastating Tornados, Arkansas Wastewater Treatment Plant Completed with Kryton’s KIM BioGard®
Massive storms took out the City of Wynne’s facility in 2023, prompting emergency federal funding to repair and future-proof critical infrastructure VANCOUVER, BC (May 11, 2026) – Kryton International, a global leader in smart concrete waterproofing, durability and antimicrobial solutions, is pleased to announce the successful completion of concrete protection work for a newly rebuilt wastewater treatment plant in the City of Wynne, Ark. Following the devastating EF-3 tornado that severely imp...