Haven Plaza Square LLC, Association of New York Catholic Homes, New York Institute for Human Development, CTA Architects, and The Wavecrest Management Team Break Ground for a New Disaster-Resilient Infrastructure Building and Other Upgrades at Manhattan’s Haven Plaza Affordable Housing Complex
Despite its utilitarian function, CTA Architects designed the new $9.89 million Haven Plaza Resiliency Building to be visually attractive by incorporating interesting architectural details into the concrete structure, such as a fully glazed front façade and vertical concrete fins. Rendering courtesy of CTA Architects New York, NY–Haven Plaza Square LLC, an affiliate of the Association of New York Catholic Homes and the New York Institute for Human Development (IHD); CTA Architects; and the...
Long Island Rail Road Builds an Award-Winning New Bridge
The Long Island Rail Road Company (LIRR) was chartered in 1834, and is one of the few railroads that survived as an intact company from its original charter to the present. Like any transportation network—especially those that have been around for 183 years—LIRR deals constantly with aging infrastructure. In 2015, this was nowhere more true than in the Village of Thomaston on the North Shore of New York’s Long Island. The village’s two-lane Colonial Road Bridge had spanned track for 115 years, w...
The Future of Transport is Magnetic
In advance of a CWIEME Berlin seminar, project leaders from two prestigious universities reveal their exciting experiences in developing magnetically-propelled transit pods for the SpaceX Hyperloop. The idea of creating new high-speed mass transit systems is a hot topic for many scientists around the world. Spurred on by technology engineering entrepreneur, Elon Musk, the race is on to create pods that can transport passengers and cargo at high speeds. Musk – the founder and co-founder of seve...
Survey Reveals Infrastructure Increase by 4.9%
2017-GOV-Survey-Final-CTA-Public
Engineered Solutions: New San Francisco 49ers Stadium Scores Big with BioMod® Stormwater Management System
Sponsored By: A large construction project such as a major-league sports stadium can include significant expanses of runoff-generating hardscape. A venue capable of seating nearly 70,000 people requires large parking areas and other impervious grounds. If rainwater can turn a football field into a muddy swamp, it can also turn a parking lot into a floodplain. Draining that area effectively and treating the runoff is a basic necessity that should be provided from th...
Americans Concerned that Delayed Repairs to Nation’s Roads and Bridges Affecting Travel Safety and Congestion
NEW YORK – As the country hits the road for the long Memorial Day weekend, the latest HNTB America THINKS survey brings new urgency to the nation’s infrastructure debate, finding most Americans have safety concerns when driving on its roads and bridges. While 92 percent of Americans believe it is extremely, or very important, to maintain existing highway and bridge infrastructure to improve highway safety and reduce congestion, just 35 percent believe their local highways and bridges are ext...
Renewable Energy Employs 9.8 Million People Worldwide, New IRENA Report Finds
Abu Dhabi, U.A.E — More than 9.8 million people were employed in the renewable energy sector in 2016, according to a new report from the International Renewable Energy Agency (IRENA). Renewable Energy and Jobs – Annual Review 2017, released at IRENA’s 13th Council meeting, provides the latest employment figures of the renewable energy sector and insight into the factors affecting the renewable labour market. “Falling costs and enabling policies have steadily driven up investment and employmen...
Better Buildings Challenge Partners Save $1.9 Billion, 18 Achieve their Portfolio-Wide Goal this Year
WASHINGTON, D.C. - The U.S. Department of Energy (DOE) today announced the energy-efficiency progress made by the 345 leading public and private sector organizations in the Better Buildings Challenge. These efforts have led to a combined 240 trillion Btus and an estimated $1.9 billion in cumulative energy and cost savings. These results are summarized in the 2017 Better Buildings Progress Report released today that highlights accomplishments across the broader Better Buildings Initiative. The go...
Zurich North America Participates in “Infrastructure Week 2017” Activities - Joins Conversation with New Webpage, White Paper and Panel Appearance
Schaumburg, IL - Zurich North America has launched a webpage dedicated to the Challenges of our Nation’s Aging Infrastructure as part of its participation in “Infrastructure Week 2017.” Infrastructure Week is a national week of events, education and advocacy efforts to elevate infrastructure as a critical issue impacting all Americans. Zurich is especially concerned about the economic impact that the debilitated state of our nation’s roads, bridges, rail, airports, water systems - and more - is...
Arcadis Completes Removal of WWI Artillery Boosters from Jersey Shores
Allenhurst, NJ. – Arcadis (EURONEXT: ARCAD), the leading global design and consultancy firm for natural and built assets, has recently completed an approximate $8 million contract by the U.S. Army Corps of Engineers (USACE) Baltimore District to locate and safely remove pieces of World War I-era artillery boosters from three New Jersey beaches. The project follows Arcadis’ selection as one of nine contractors for the Multiple Award Military Munitions Services II contract valued at up to $240 mil...