Burak Boyaci, P.E., Product Manager for LEAP Bridge Steel at Bentley Systems, takes time to speak with Informed Infrastructure about updates to the AASHTO Bridge Design Specifications, including the field splice design approach and other aspects.
Code Update: Steel Bridge Design Specifications Revised in New AASHTO Edition
Interim revisions to AASHTO LRFD Bridge Design Specifications (7th Edition) were published in 2016 with a few minor revisions to the steel bridge design…