/ Category / Design-Bid-Build

Fargo Flood Diversion Authority Approves P3 Project Delivery Method

September 3, 2015 - in Corporate, Stormwater

The Flood Diversion Board of Authority is moving forward with an intent to develop a project delivery method which will facilitate a shorter construction schedule for the Diversion Project, and at a lower cost than would be possible under standard delivery…